Measure the surfaces. Define the package. Plan the purchase.Explore the global TB platform
QUANTITIES & COSTS

Build the estimate around actual work items.

Connect room schedules, measured surfaces, material purchases and quote boundaries.

A TRACEABLE BASIS

Keep three decisions separate.

Measured work

List actual floors, walls and openings, not one area for every trade.

Purchase quantity

Show allowance and whole-unit rounding separately from measured quantity.

Commercial package

Identify material-only, installed and other scope boundaries.

EXPLAIN A REVISION

Was it the surface, product or rate?

A total can change because of more work, another allowance, different coverage or a revised quotation. Keep those reasons visible. Record unknown conditions and pending selections for review.

Explore the TB workspace

Open a TB sample estimate
AN ESTIMATE PEOPLE CAN CHECK

From a surface schedule to a defined package.

Map the surfaces

Identify rooms, floors, walls and retained finishes.

Measure the work

Record dimensions, openings and separate work items.

Plan procurement

Check product coverage, allowance and whole packs.

Review the package

Confirm preparation, delivery, handling and exclusions.

WORKED GUIDES

Apply the method to the next decision.

Guides
RENOVATION · MEASURED SURFACES

Give each surface its own work description.

Build a room-by-room schedule that separates retained finishes, removal, preparation and new work.

Read the guide
MATERIAL PURCHASING · TILES

Move from a finish selection to a whole-box purchase.

Connect measured area, layout allowance and actual box coverage before comparing a tile supply price.

Read the guide
FIT-OUT · QUOTE INCLUSIONS & ACCESS

Compare a defined work package, not a headline total.

Check material scope, preparation, handling and site-specific delivery assumptions alongside the quoted rate.

Read the guide
BEFORE THE NEXT RENOVATION QUOTE OR MATERIAL ORDER

Make the detail behind the price visible.

Explore quantities, material purchasing, editable costs and resources in TrendyBuilders. Choose capacity for your own work or a team.

Make every allowance explainable.See plans